City of Kirkland Totem Lake Culvert Replacement -

Dual excavatorsShown is one of the Junction structures manufactured for the City of Kirkland, WA. Measuring  9’ x 15’ x 9.5’ with two large penetrations,  this is the smaller of the two used on this project. The contractor, Scarcella Brothers, is utilizing two large excavators to set the structure vs. a crane, (hence the angle and stresses applied).  This structure contained 18,800’ of rebar and 83,500 lbs. of concrete.



See More in the Category.